This project replaced 1,050 LF of existing 10” sewer main with new 12” sewer main by trenchless pipe bursting methods, 800 ft of open trench 12” PVC sewer main, and disposal of 540 LF of AC Sewer main, and associated surface restoration. Challenges overcome during this project was its tight 6-week schedule, maintaining 1,000 GPM sewer service with a temporary bypass for upstream raw water pump station, pipe bursting pipe near gas main and other utilities, and its proximity to Rapid Creek maintain compliance with Storm Water Permits.